LK Automation Limited
Home >> Download >> MITSUBISHI >> Manual Download >> Q173NCCPU-S01 Manual MITSUBISHI PLC Q173NCCPU-S01 MELSAP-L Programming Manual

Q173NCCPU-S01 Manual MITSUBISHI PLC Q173NCCPU-S01 MELSAP-L Programming Manual

Product model: Q173NCCPU-S01
Name: PLC
Brand: MITSUBISHI
Sort: MELSAP-L Programming Manual
File language: English
File size: 3.16MB
Three-phase 4 wire type.
Measuring circuit number: 3 circuits.
Measurement items: power consumption (consumption, regeneration), current, voltage, power, power factor, etc..
Power measurement module product group capable of simply measuring various energy information.
With only one module can be used to measure and power consumption (consumption and regeneration), reactive power, current, voltage, power, power factor and frequency of all kinds of detailed information MITSUBISHI PLC Programming Manual Q173NCCPU-S01
No ladder program can continue to monitor the minimum and maximum values, can also perform 2 types of upper / lower limit alarm.
Only in the ON state can be used to measure the output of the output device.
Therefore, the amount of electricity and the quantity of electricity in the unit of the beat can be obtained during the operation of the equipment MITSUBISHI PLC Programming Manual.
3 phase 3 wire products can be used to measure up to 4 circuits in one slot,
3 phase 4 wire products can be used to measure up to 3 circuits,
So the electrical energy measurement can be carried out in a small space by the multi circuit products.
For example, a module can be used to measure other loads from the control panel trunk MITSUBISHI PLC Programming Manual.
In addition, Works2 GX (version 1.90U and higher) can be used to easily set parameters.Bidirectional thyristor output: 32 points.
Rated current and voltage: 240V ~ 0 Q173NCCPU-S01 Programming Manual. 6A/1 AC100 point, 2.4A/1 public end, 8 point 1 Public end.
Response time: 1ms+0.5 cycle.
External wiring connections: 38 terminals (terminals sold separately) Q173NCCPU-S01 Programming Manual.
Replacement model: AY23.AC input: 32 points.
Rated current and voltage: AC100 ~ 120V, 10mA (AC100V, 60Hz).
Response time: 25ms.
Input form: 1 points, 32 public ends.
External wiring connections: 38 terminals (terminals sold separately).
Replacement model: AX11.Cable length 3 meters Q173NCCPU-S01 Programming Manual.
Extended substrate for connection.Input and output points: 4096 points.
Input / output data points: 8192 points.
Program capacity: 124k.
Basic command processing speed (LD command) S:0.075.
The length of time required to execute the instruction, the length of the user''s program, the type of instruction, and the speed of the CPU execution are very significant,
Generally, a scanning process, the fault diagnosis time,
Communication time, input sampling and output refresh time is less,
The execution time is accounted for the vast majority of.
The photoelectric coupler is composed of two luminous two extreme tubes and a photoelectric transistor.
Light emitting diode two: the input of a photo coupler and the change of electrical signal,
The light signal is generated by the light emitting diode, which is the same as the input signal.
The working process of the input interface circuit: when the switch is closed, the diode light,
The transistor is then guided to the internal circuit and input signal under the irradiation of the light.
When the switch is off, the diode does not emit light, and the transistor is not on the way. Internal circuit input signal.
It is through the input interface circuit to the external switch signal into PLC internal can accept the digital signal.
Photoelectric three levels: in the light of the light signal conduction, the degree of light signal and the intensity of the light signal.
The output signal has a linear relationship with the input signal in the linear operating region of the photoelectric coupler.
User program storage capacity: it is a measure of how mucch the user application can store the number of indicators Q173NCCPU-S01 Manual .
Usually in words or K words as units. 16 bit binary number is a word,
Every 1024 words are 1K words. PLC to store instructions and data in words.
General llogical operation instructions each account for 1 words MITSUBISHI PLC Programming Manual. Timer / counter,
Shift instruction accounted for 2 words. Data operation instructions for 2~4.
Related products
MITSUBISHI
CNC numerical control CPU
Q173NCCPU-S01
MITSUBISHI CNC numerical control CPU Q173NCCPU-S01
Set high performance CNC and high speed progr