LK Automation Limited
Home >> Price >> MITSUBISHI >> MR-J3-10B1-RJ006 MITSUBISHI MR-J3-10B1-RJ006
Brand sort

MR-J3-10B1-RJ006 MITSUBISHI MR-J3-10B1-RJ006

Country: JAPAN
Name: Full closed loop control driver
Price: 0
MITSUBISHI MR-J3-10B1-RJ006
Input type: DC input, positive public end / negative public end.
Input points: 16 points.
Enter the response time: 10ms the following.
Rated input voltage / current: DC24V/7mA.
External connection: 2 wire.
Type of input and output terminal.
Using 2 pieces of structure of the terminal units, maintenance can be maintained in the same line under the condition of the replacement module MITSUBISHI MR-J3-10B1-RJ006. Input and output points: 1024 points MR-J3-10B1-RJ006
Input / output data points: 1024 points.
Program capacity: 14K.
Basic command processing speed (LD command) s:0.20.
Optical data communication line.
Each scanning process. Focus on the input signal sampling MITSUBISHI MR-J3-10B1-RJ006. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read .
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program MITSUBISHI MR-J3-10B1-RJ006.
The length of the scan cycle is determined by the three .
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
User program storage capacity: it is a measure of how much the user application can store the number of indicators.
Usually in words or K words as units. 16 bit binary number is a word,
Every 1024 words are 1K words. PLC to store instructions and data in words.
General logical operation instructions each account for 1 words. Timer / counter,
Shift instruction accounted for 2 words. Data operation instructions for 2~4. RS-232 1 channels.
With DC input 2 points.
Transistor output 2.
Number of stations: 1 stops.
Station type: intelligent equipment station.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electriical wiring diagram and wiring diagram MR-J3-10B1-RJ006.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program deesiign and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced MR-J3-10B1-RJ006.
MR-J3-10B1-RJ006 Operation manual/Instructions/Model selection sample download link: /searchDownload.html?Search=MR-J3-10B1-RJ006&select=5


...more relevant model market price >>>>
Related products