LK Automation Limited
Home >> Download >> MITSUBISHI >> Manual Download >> MITSUBISHI A970GOT-LBA-EU Hardware User's Manual

MITSUBISHI A970GOT-LBA-EU Hardware User's Manual

Product model: A970GOT-LBA-EU
Name: touch screen
Brand: MITSUBISHI
Sort: Hardware User's Manual
File language: English
File size: 0.85MB
RS-422 1 channel, RS-422/485 1 channel.
Transfer speed: 0.3-19.2kbps.
Equipment layer / field bus CC-Link device layer is the PLC and other control devices and sensors and drive devices connected to the field network,
Network for the lowest layer of the whole network system.
Using CC-Link field bus connection, the number of wiring is greatly reduced,
Improve the maintainability of the system A970GOT-LBA-EU Hardware A970GOT-LBA-EU
And, not just the amount of data ON/OFF and other switches,
Can also be connected to the ID system, bar code reader, inverter, man-machine interface and other intelligent devices,
From the completion of a variety of data communication, the management of the terminal production information can be realized,
On the centralized management of the state of the machine movement,
Make maintenance work efficiency also greatly improved A970GOT-LBA-EU Hardware.
Q series PLC in the use of CC-Link function better,
And easier to use. Input and output points: 512 points.
Input / output data points: 512 points.
Program capacity: 14K.
Basic command processing speed (LD command) s:0.20.
Optical data communication line.
Each scanning process A970GOT-LBA-EU Hardware. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
User program storage capacity: it is a measure of hoow much the user application can store the number of indicators A970GOT-LBA-EU User's Manual.
Usually in words or K words as units. 16 bit binary number is a word,
Every 1024 words are 1K words. PLC to store instructions and data in words.
General llogical operation instructions each account for 1 words A970GOT-LBA-EU User's Manual. Timer / counter,
Shift instruction accounted for 2 words. Data operation instructions for 2~4.